Project Description
As part of renovations and improvements to the existing high school, the existing stadium will be improved and renovated to include a multi-purpose synthetic turf athletic field (rubber/sand infill), a synthetic (EDPM rubber/urethane) 8-lane running track, new field venues (long jump, high jump, and pole vault), associated drainage and site improvements. Other improvements included a new stadium entrance area/courtyard, installation of new walkways, and installation of a hand-cap ramp/walkway to provide access from the upper rim of the stadium to field level to provide ADA required access to the visitor grandstands.
Services Rendered
ELA Group provided design, consulting, construction document preparation, and construction administration/observation services.
|