Warwick Township Municipal Campus Expansion (Lititz, PA)

Client: Warwick Township

Contact: Daniel Zimmerman, Township Manager

Professional Services Provided:

  • Athletic Fields
  • Bid Phase Administration
  • Construction Administration
  • Construction Documents
  • DCNR Grant
  • Erosion & Sedimentation Control
  • Land Development Plan
  • Master Planning
  • Roadway Improvements
  • Stormwater Management
  • Subdivision

ELA Group Planners worked with Warwick Township (Lititz, PA) to develop a Master Plan for expanding the Township Municipal Campus. Working with the Township, ELA Engineers designed a parking lot covering 3,420 square feet. The lot provides 27 parking spaces, including three ADA handicapped spaces.

To improve stormwater management, one section of the parking lot is constructed of porous pavement, framed by 6,200 square feet of porous concrete sidewalk. The combined porous paving and concrete is designed to infiltrate runoff and offset some of the paving associated with the campus expansion. This area is situated in a low portion of the site and acts as an effective water quality BMP before runoff enters an adjacent bio-retention area. During rain events, the runoff percolates into the porous paving and sidewalk, while runoff in other impervious areas sheet flows across the paved surfaces.

Project Gallery